# Scheduling team and time on tasks or steps

This article explains how to schedule work directly on a task or step so planned time automatically flows into the Schedule view.

You can schedule time **directly at the task level**, rather than having to jump back and forth between tasks and the [Schedule view.](https://help.outlign.co/en/articles/63-how-to-use-scheduling.md)

As you work through the day, you can plan time for yourself or your team exactly where the work happens, on the task or step itself. Any time you schedule here, it automatically appears in the Schedule view, keeping everything in sync.

![](https://staticfiles.gleap.io/gattachments/6JlU89RkwzoTn8jE87erGzkNhxA8kTHcW1KZwmFEC3PE8tbIZ6fmwY38LLObH5BOgN3nhu3jx0C.png)

### **How to schedule time on a task**

1.  Open any **task or step** in a project.
    
2.  Click the **Schedule** link on the task.
    
3.  Select the **team member** you want to schedule.
    
4.  Choose a **start date** and **end date**.
    
    -   These can be the same day, or spread across multiple days.
        
5.  Set the time allocation:
    
    -   Enter **hours per day**, or
        
    -   Enter **total hours**, and Outlign will automatically calculate the daily hours for you.
        
6.  (Optional) Add **notes** to this scheduled time.
    
7.  Assign the task to the team member if needed (so that they are assigned at the task level _and_ in the schedule)
    
8.  Click **Save**.
    

![](https://staticfiles.gleap.io/gattachments/mXXav6eKNGFwYWZSfQCUZD9ssoFqieWvCcgfrlsPMXAflPwj9ZavzYKm90Tdn2XGvQJXHEXj2qf.png)

### **Scheduling multiple people on the same task**

You can schedule more than one person on the same task.

-   After saving one schedule entry, click **Schedule** again.
    
-   Choose another team member.
    
-   Select their dates and hours
    
-   Save.
    

![](https://staticfiles.gleap.io/gattachments/D6FezqQ0H33iN9sypjUGEQBQgb5vmnA4o36qVrWkwUru3cPpfka9jcGqeEdyXIWCRTQoFgaIWlk.png)

Each person’s time is stored separately and shown clearly on the task.

### **Viewing and managing scheduled time**

From the task, you can:

-   See **who is scheduled** on that task at a glance.
    
-   Click **Open in Schedule** to jump straight to the Schedule view.
    
-   Edit or delete scheduled time if plans change.
    

![](https://staticfiles.gleap.io/gattachments/SM7DnTPQ7QEbjYZCdZmz8EruKb7AKVT9OrfUwaZiTftZieOB2c4VlY9IPar90xt2hf3eN5y1eMO.png)

### **How multiple scheduled tasks are grouped in the Schedule view**

When you schedule **multiple tasks or steps within the same project for one team member**, Outlign automatically groups them together in the Schedule view.

For example:

-   You schedule **Website design** for a designer.
    
-   Within the same project, you then schedule **Contact page design** for the same person, during the same general timeframe.
    

In the Schedule view, Outlign will **collate these tasks together**, pulling all related tasks from that project into a single grouped view. This gives you a clear picture of how that person’s time is allocated across the project, without clutter or duplication.

You still retain task-level detail, but the Schedule view stays clean and easy to read.

### **How scheduled hours are calculated**

The number of hours shown as scheduled on a task **only includes time from the current week onwards**.

Any time that was scheduled in **previous weeks is excluded** from this total. This is intentional, and it means:

-   You’re seeing how much work is still **to be done**
    
-   Not the time that has already elapsed
    
-   Making it easier to understand the remaining effort on a task at a glance
    

Think of scheduled hours as _forward-looking_, not historical.

### **Why this is useful**

-   Plan work where it actually happens, on the task.
    
-   Avoid double-handling scheduling.
    
-   Keep the Schedule view automatically up to date.
    
-   Make day-to-day project planning faster and smoother.
    

To learn more about the schedule feature and how to use this to plan your team and work head to our help article here [https://help.outlign.co/en/articles/63-how-to-use-scheduling](https://help.outlign.co/en/articles/63-how-to-use-scheduling.md)